BeltPrints Search Sign in
Vulcanus

Molten iron and copper from lava on Vulcanus

Molten iron and copper from lava on Vulcanus is a blueprint with 1,096 entities in a 77×37 tile area, mainly 30 × foundry. It needs Space Age. Copy the string and import it from the blueprint library.

Top-down preview of Molten iron and copper from lava on Vulcanus
  • Red belts 658
  • Pipes and fluids 329
  • Inserters 77
  • Furnaces 30
  • Circuits 2
Simplified drawing: each colour is a building type, not game graphics. Zoom in and hover a building to see what it is and what it makes.

About this build

Foundries turning lava and calcite into molten iron and molten copper, the start of almost every Vulcanus base. A parameter chooses which metal it makes. It has 1,096 buildings in a 77 by 37 tile area. It is part of Tumi's Vulcanus 120 SPM book.

Tumi's notes: 2 inner belts are for Calcite, the outer belts output Stone. Parameter chooses Copper or Iron. Need one of each for 120SPM. Outputs 5.625 red belts of stone!

Before you place it

  • Clear a space of at least 77 × 37 tiles.
  • You need the Space Age expansion (Foundry).
  • It has 30 crafting machines, so connect enough power before you switch it on.
  • It is large: construction robots will place it much faster than building by hand.
  • It uses circuit logic. Do not remove wires or combinators when you adapt it.

Did it work for you?

Nobody has reported back yet. Your answer helps the next player.

What it uses

  • Fast transport belt634
  • Pipe209
  • Pipe to ground120
  • Fast inserter77
  • Foundry30
  • Fast underground belt24
  • Constant combinator2

Recipes

  • Parameter 0 ×30

Facts

TypeBlueprint
Game version2.0.73
Space AgeRequired (Foundry)
Size77 × 37 tiles
Entities1,096
PowerAbout 78 MW with all 30 machines working. Modules are included; inserters, belts, lamps and robot charging are not.
CheckedPassed an automated check against Factorio 2.1 game data. The foundries use a blueprint parameter as their recipe (you pick the metal when you place it), which the checker cannot resolve.

Space AgeVulcanusSmelting

Numbers behind builds like this: Vulcanus casting ratio: foundries for molten iron and plates · furnaces per belt: 48 stone or 24 steel furnaces per yellow belt · mining drills per belt: 30 electric drills fill a yellow belt

Something wrong with this blueprint, or is it yours and you want it changed? Report it or e-mail me.