BeltPrints Search Sign in

Aquilo heating: what needs heat and how much

On Aquilo most buildings freeze unless they touch a heat pipe or heat source above 30 °C. An assembler, chemical plant or lab needs 100 kW of heat, a belt 10 kW and an inserter 30 kW, while underground belts need 50 to 200 kW each. One heating tower gives 40 MW of heat.

Heat each building needs

BuildingHeat
Pipe1 kW
Transport belt10 kW
Inserter30 kW
Pumpjack50 kW
Underground belt50 kW (fast 100, express 150, turbo 200)
Assembling machine, chemical plant, lab100 kW
Pipe to ground150 kW
Foundry300 kW
Beacon400 kW

Heat pipes only lose heat to buildings that need it, so long heat pipe runs are cheap. Underground belts and pipes to ground are the expensive part: route belts and pipes above ground next to heat pipes where you can.

Heating towers

40 MW covers the heat of about 400 assemblers or 4,000 belts, so keeping a factory block warm takes only a tower or two. The bigger heat user is usually power: heat exchangers on the same heat network turn the rest into electricity.

Other Aquilo rules

Ready-made builds: Aquilo blueprints.